INTERIORS
       
     
ARCHITECTURE
       
     
INTERIORS
       
     
INTERIORS

KIMA can provide interior design services to complement our architectural services, to give the client a turn-key service or alternatively they can provide an interior design service only. 

KIMA is passionate about natural materials such as stone, timber and leather. This has led them to form enduring relationships with various workshops and craftsmen, many of whom are Italian, in view of the director’s Italian heritage. The KIMA team prides themselves on their knowledge of materials and are confident in what their experience have taught them. 

Concept Design

This is when KIMA talks to clients about their wish lists and must-haves; as well as the colours and textures and wow aspects they would like their property to have. They will then go away and prepare a client presentation with sketches, simple layout drawings, precedent analysis, material samples and broad cost information. KIMA can produce rendered interior perspectives in-house or outsource the production of computer-generated images.

KIMA encourages clients to be involved and be part of the design process. They proudly keep an extensive library of samples and catalogues of finishes; fittings and furniture, which helps the team and their clients, come to great decisions together.

 

Interior Technical Design

As with the architectural technical design stage (RIBA stage 4), this is the most intensive part of the design services on a project.

By the end of it, the team will have prepared a package of information, consisting of technical detail drawings, specifications, schedules, detailed cost document and other documents that can be used for tender purposes.

 

Material Procurement

Materials refer to the finishes such as stone, timber, fabric and wallpaper, leather, special finishes etc. KIMA has built relationships with various suppliers over time, which allows them to procure materials for clients at favourable rates. Handling the procurement gives KIMA the advantage of being able to control the quality and the final installation, to reflect the design intent.

 

Furniture, Fittings & Equipment (FF&E)

Furniture, fittings and equipment is a term for the service of sourcing, specifying and procuring items such as loose furniture, soft furnishings, decorative lighting, sanitary ware, ironmongery, kitchen appliances and so on.

KIMA has built great relationships with various workshops and manufacturers, which allows them to procure materials for clients at favourable rates. To deliver unique results KIMA often works with the craftsmen to customise or create bespoke pieces.

ARCHITECTURE
       
     
ARCHITECTURE

KIMA is registered with the Royal Institute of British Architects – known as RIBA – as a chartered practice. Members of RIBA voluntarily follow their rules of conduct and standardisation and are expected to conduct their practice of architecture in accordance with all relevant legal requirements. 

An important tool/guide produced by RIBA is the ‘Plan of Work 2013’. It is a division of the architect’s services provided during the design and construction process, divided into eight stages. Each stage is defined and has specific tasks and outputs required. This is useful for clients in that KIMA’s services and fees are broken down into realistic, manageable parts. 

RIBA Stages 0, 1 and 2

Feasibility & Concept Design

Right at the outset, KIMA visit the property to understand the buildings or property’s context and location, the condition the building and its services and study any site information available. The team meet with the client to discuss their requirements, expectations and project budget, to define a strategic brief. KIMA can then advise on Planning and Licensing and the project team that is necessary to carry out the project and prepare a preliminary cost appraisal. KIMA will then make the client aware of their responsibilities under the government’s Health and Safety Executive’s ‘Construction Design and Management Regulations 2015’.

KIMA will draft a Letter of Agreement that contains the above information and that sets out its terms and fees. They do not normally proceed to Concept Design without an agreement in place.

KIMA will then develop a Concept Design to present to the client. This can include any of the following: sketches, simple CAD drawings, a precedent analysis i.e. a study of similar projects in images or a small selection of samples. From there the team works with the client to agree to a final project brief. At the same time, they will outline a proposal for the structure and services. The team can also work on an outline specification and preliminary cost information at this stage, if required.

 

RIBA Stages  3

Planning

Depending on the complexity of the project, KIMA will advise the client on the best planning strategy with regards to obtaining statutory approval(s). KIMA will produce all drawings and documents necessary and, if appointed as Lead Consultant, will manage the relevant sub consultants (such as Heritage, Structural Engineer, Services Engineer, etc.) as required. KIMA will follow any conditions attached to the approval and can make applications for minor variations if required.

KIMA has experience with Listed Buildings and Conservation Areas and the planning policies of all central London Boroughs. They also have experience working in Boroughs outside the greater London area. KIMA is familiar with the process of obtaining licenses required by other parties such as the Freeholder, Scheme of Management, Building Management, etc.

KIMA will advise the client on the need for appointing a Party Wall Surveyor to abide by the Party Wall Act of 1996 and liaise with them from there on.

Please note that KIMA, as with any reputable architectural practice, cannot guarantee or influence the outcome of planning applications and other approvals from third parties. KIMA cannot guarantee approvals will be granted or, if granted, will be in accordance with any anticipated timescale. 

 

RIBA Stage 4

Technical Design

This is the busiest, most intense stage of a project for the architectural team. This is also what KIMA excels at. By the end of this stage, KIMA will have prepared a package of information, consisting of technical detailed drawings, specifications, schedules and other documents that can be used for tender purposes that comply with current legislation (Building Control, etc.). The information contained in the package will be fully coordinated with the information of other consultants (e.g. the structural engineer, mechanical and electrical engineer, lighting consultant, home automation, landscaper, etc.).